Goyal said he was awaiting the details of the delay and the engine failure, but added that the train had reached its destination about 100 minutes behind schedule. The train was running late by about 35 minutes and another around 60 minutes were lost after the engine failed inside the tunnel about five kms before Katra Railway Station.